Reduced level of service, average condition (6.5) continues to fall, but more rapidly. Additional spot maintenance required; Road reconstructions to less than 0.5% of network per year; No new kerb and gutter works; No new gravel road works; grading maximum twice per year; No new bridge works; some bridges will require load or speed restrictions.